Aralia Park
Aralia Park | Simpang Ampat, Penang | Freehold Condominium in Pearl City
In short
Aralia Park is a high rise condominium in Simpang Ampat, Penang by Tambun Indah Land. The development holds 359 units, 20 storeys, 2 to 3 bedroom layouts, built-ups from 775 to 1,194 sq ft. The land is freehold, the development is completed.
About Aralia Park
Aralia Park sits in Simpang Ampat, Penang. The layout comes to 2 blocks, 359 homes, 20 floors.
There are 6 layouts on offer covering 2 to 3 bedrooms between 775 and 1,194 sq ft. It gives Aralia Park a mix rather than a single repeated plan.
Aralia Park is developed by Tambun Indah Land on freehold land. The land usage is classified as commercial under HDA.
The numbers behind it: 20 storeys, 2 lifts serving them, a commercial under HDA land title.
Unit types
Get the floor plans →Aralia Park is released in 6 layouts from 775 to 1,194 sq ft. The entry plan is Type A1 at 775 sq ft with 2 bedrooms. The largest is Type C at 1,194 sq ft running to 3 bedrooms. Six layouts across two towers. Types A, B and C run from the 7th to the 20th floor — 807, 1,022 and 1,194 sq ft, two bedrooms for Type A and three for B and C, with Type C adding a study area off the dining space. Types A1, B1 and C1 are the 6th-floor versions of the same three plans, slightly smaller at 775, 979 and 1,087 sq ft, and they trade the balcony for a terrace. Every unit has a 10 ft ceiling. All six plans are on this page.
| Type | Built-up | Bedrooms | Bathrooms |
|---|---|---|---|
| A | 807 sq ft | 2 | 2 |
| B | 1,022 sq ft | 3 | 2 |
| C | 1,194 sq ft | 3 | 2 |
| A1 | 775 sq ft | 2 | 2 |
| B1 | 979 sq ft | 3 | 2 |
| C1 | 1,087 sq ft | 3 | 2 |
Floor plans
Ask for full resolution →Why buyers take it
It is already built. Nothing here is a rendering. You can walk the corridor, ride the lift at 8am, see how the finishes have aged and meet the neighbours — none of which is available on an off-plan purchase.
6 layouts to choose from. Enough that the floor plan can be matched to how you actually live rather than the other way round — worth walking more than one before deciding.
Freehold. No lease to run down and no state consent needed on a future sale — which also means no lease-extension cost landing on a later owner.
Why some walk away
The defect liability period has expired. Anything you find after handover is yours to fix, and whatever the previous owner renovated comes with the unit. View with a contractor rather than an agent, and look at the wet areas and the balcony line specifically.
It sits on a commercial title. Housing-development protections still apply where the title says under HDA, but assessment and utility tariffs can follow the commercial schedule. Ask the developer to confirm in writing which one applies before you budget the monthly cost.
No facility list is on record here. Ask for one in writing. What is shared decides a good part of the monthly charge, and a render of a pool is not a commitment to build one.
No indicative price is published for this project. Without one you cannot compare it against anything else in Simpang Ampat on a per-square-foot basis. Ask for the current price list by layout and floor band, not a single 'from' figure.
Every figure on this page comes from the developer. Unit counts, built-ups, distances and completion dates are as published by the developer or its appointed agents, and none of it is independently verified. Check anything you intend to rely on against the sale and purchase agreement.
Project details
| Developer | Tambun Indah Land |
|---|---|
| Location | Simpang Ampat, Simpang Ampat, Penang |
| State | Penang |
| Property Type | High Rise Condominium |
| Tenure | Freehold |
| Land Title | Commercial under HDA |
| Land Area | — |
| Towers | 2 blocks |
| Total Units | 359 |
| Total Floors | 20 storeys |
| Units per Floor | — |
| Lifts per Floor | 2 lifts |
| Completion | CCC targeted end 2027, handover targeted 2H 2028 |
Development at a Glance
Everything below comes from the developer’s own material. These are the figures that are fixed at construction — renovation changes none of them, so they are worth checking before anything else.
- **Developer** — Tambun Indah Land- **Property type** — High Rise Condominium- **Tenure** — Freehold- **Land title** — Commercial under HDA- **Blocks** — 2 blocks- **Storeys** — 20 storeys- **Total units** — 359- **Lifts** — 2 lifts- **Car parking** — 2 to 3 bays per unit — 752 car parks plus 5 OKU bays- **Completion** — CCC targeted end 2027, handover targeted 2H 2028
What the numbers actually say
The building holds 359 homes in total.
Lift provisioning is the number people notice daily and can never change afterwards: with 2 lifts in each of the 2 blocks. That works out to roughly 90 homes per passenger lift, which is about the industry norm.
Car parking is 2 to 3 bays per unit — 752 car parks plus 5 OKU bays. In a completed development this is one of the few things you cannot renegotiate afterwards, so check it against how many cars you actually run.
The development is finished and the certificate of completion has been issued, so what you view is what you get — no construction risk and no waiting period, but also no scope to vary the layout.
### Unit Types
| Type | Size | Bedrooms | Bathrooms | Notes | |---|---|---|---|---| | A | 807 sq ft | 2 | 2 | 7th to 20th floor; approx 75 sq m | | B | 1,022 sq ft | 3 | 2 | 7th to 20th floor; approx 95 sq m | | C | 1,194 sq ft | 3 | 2 | 7th to 20th floor; approx 111 sq m, with a study area | | A1 | 775 sq ft | 2 | 2 | 6th floor, with a terrace in place of the balcony; approx 72 sq m | | B1 | 979 sq ft | 3 | 2 | 6th floor, with a terrace; approx 91 sq m | | C1 | 1,087 sq ft | 3 | 2 | 6th floor, with a terrace; approx 101 sq m |
Six layouts across two towers. Types A, B and C run from the 7th to the 20th floor — 807, 1,022 and 1,194 sq ft, two bedrooms for Type A and three for B and C, with Type C adding a study area off the dining space. Types A1, B1 and C1 are the 6th-floor versions of the same three plans, slightly smaller at 775, 979 and 1,087 sq ft, and they trade the balcony for a terrace. Every unit has a 10 ft ceiling. All six plans are on this page.
Inside the Development
The developer does not publish a facilities list for this development. What is on record:
- **Car parking** — 2 to 3 bays per unit — 752 car parks plus 5 OKU bays- **Ceiling height** — 10 ft- **Lifts** — 2 lifts- **Storeys** — 20 storeys- **Blocks** — 2 blocks
Location & Connectivity
Simpang Ampat sits in Seberang Perai Selatan, the stretch of mainland Penang that has grown fastest since the second bridge opened. Aralia Park is inside Pearl City, Tambun Indah’s own township there, which is why the immediate surroundings are planned rather than piecemeal — Sri KDU International School and the township’s commercial rows are the local anchors. Batu Kawan with IKEA and Design Village is the nearest big retail draw, the Bukit Tambun and Simpang Ampat interchanges put the North-South Expressway on the doorstep, and the Penang Second Bridge takes you across to Batu Maung on the island.
- Pearl City township- Aeon Mall Bukit Mertajam- Batu Kawan, IKEA and Design Village Outlet Mall- Sri KDU International School- North-South Expressway — Bukit Tambun and Simpang Ampat interchanges- Penang Second Bridge to the island- Batu Kawan Industrial Park
Developer Background
Aralia Park is developed by Tambun Indah Land.
Frequently Asked Questions
**Is Aralia Park completed?** CCC targeted end 2027, handover targeted 2H 2028.
**What unit types are available at Aralia Park?** 6. Type A is 807 sq ft with 2 bedrooms and 2 bathrooms; Type B is 1,022 sq ft with 3 bedrooms and 2 bathrooms; Type C is 1,194 sq ft with 3 bedrooms and 2 bathrooms; Type A1 is 775 sq ft with 2 bedrooms and 2 bathrooms; Type B1 is 979 sq ft with 3 bedrooms and 2 bathrooms; Type C1 is 1,087 sq ft with 3 bedrooms and 2 bathrooms.
**How many units does Aralia Park have?** 359.
**How many car park bays come with a unit at Aralia Park?** 2 to 3 bays per unit — 752 car parks plus 5 OKU bays.
**What sizes does Aralia Park offer?** Six layouts. Floors 7 to 20 carry Type A at 807 sq ft, Type B at 1,022 sq ft and Type C at 1,194 sq ft. The 6th floor carries Type A1 at 775 sq ft, Type B1 at 979 sq ft and Type C1 at 1,087 sq ft, each with a terrace instead of a balcony.
**How many units and floors are there?** 359 units in two 20-storey blocks, served by two lifts.
**How much parking is there?** 752 car park bays plus five OKU bays, working out to two or three bays per unit depending on the type.
**Is Aralia Park freehold?** Yes. The land title is a serviced apartment title under the Housing Development Act.
**When will it be handed over?** The developer records the build at 50% as at 11 August 2026, with CCC targeted for the end of 2027 and handover targeted for the second half of 2028.
Location
Aralia Park is located in Simpang Ampat, Penang at Simpang Ampat, Simpang Ampat, Penang. Within reach are Pearl City township, Aeon Mall Bukit Mertajam, Batu Kawan, IKEA and Design Village Outlet Mall and Sri KDU International School.
Day-to-day convenience at Aralia Park comes from what is already built nearby. The immediate surroundings hold Pearl City township, Aeon Mall Bukit Mertajam, Batu Kawan, IKEA and Design Village Outlet Mall, Sri KDU International School, North-South Expressway and Penang Second Bridge to the island. One more is listed below.
Simpang Ampat sits in Seberang Perai Selatan, the stretch of mainland Penang that has grown fastest since the second bridge opened. Aralia Park is inside Pearl City, Tambun Indah's own township there, which is why the immediate surroundings are planned rather than piecemeal — Sri KDU International School and the township's commercial rows are the local anchors. Batu Kawan with IKEA and Design Village is the nearest big retail draw, the Bukit Tambun and Simpang Ampat interchanges put the North-South Expressway on the doorstep, and the Penang Second Bridge takes you across to Batu Maung on the island.
- Pearl City township
- Aeon Mall Bukit Mertajam
- Batu Kawan, IKEA and Design Village Outlet Mall
- Sri KDU International School
- North-South Expressway — Bukit Tambun and Simpang Ampat interchanges
- Penang Second Bridge to the island
- Batu Kawan Industrial Park
Developer: Tambun Indah Land
Aralia Park is developed by Tambun Indah Land. See other projects by this developer →
Aralia Park, answered
Is Aralia Park freehold or leasehold?
Aralia Park in Simpang Ampat, Penang is held on a freehold title on a commercial under HDA land title.
What unit types are available at Aralia Park?
Aralia Park offers 6 layouts from 775 to 1,194 sq ft — Type A at 807 sq ft, Type B at 1,022 sq ft, Type C at 1,194 sq ft, Type A1 at 775 sq ft.
How many units does Aralia Park have?
Aralia Park in Simpang Ampat, Penang has 359 units across 20 storeys.
When will Aralia Park be completed?
Completion for Aralia Park is scheduled for CCC targeted end 2027, handover targeted 2H 2028 Dates are set by the developer and can move.
Who is the developer of Aralia Park?
Aralia Park is developed by Tambun Indah Land.
Where exactly is Aralia Park?
Aralia Park is in Simpang Ampat, Penang at Simpang Ampat, Simpang Ampat, Penang Malaysia.
How do I get the floor plans for Aralia Park?
Message us on WhatsApp and a licensed representative sends the floor plans, the current developer price list and unit availability for Aralia Park. There is no fee to the buyer.
Is Aralia Park completed?
CCC targeted end 2027, handover targeted 2H 2028.
How many car park bays come with a unit at Aralia Park?
2 to 3 bays per unit — 752 car parks plus 5 OKU bays.
What sizes does Aralia Park offer?
Six layouts. Floors 7 to 20 carry Type A at 807 sq ft, Type B at 1,022 sq ft and Type C at 1,194 sq ft. The 6th floor carries Type A1 at 775 sq ft, Type B1 at 979 sq ft and Type C1 at 1,087 sq ft, each with a terrace instead of a balcony.
How many units and floors are there?
359 units in two 20-storey blocks, served by two lifts.
How much parking is there?
752 car park bays plus five OKU bays, working out to two or three bays per unit depending on the type.
Is Aralia Park freehold?
Yes. The land title is a serviced apartment title under the Housing Development Act.
When will it be handed over?
The developer records the build at 50% as at 11 August 2026, with CCC targeted for the end of 2027 and handover targeted for the second half of 2028.
Something here not answered?Ask about Aralia Park on WhatsApp →
Guides worth reading before you decide
Eleven Penang projects in districts with nothing to compare them against
The Penang districts too small to have a cluster of their own.
New launch or subsale?
This one is already built, so it can be compared against subsale stock directly.
Freehold vs leasehold, and what it changes for you
The land title is recorded as Commercial under HDA — what that does to the monthly bill.
Penang island or mainland: the same budget, four times the floor area
What the same budget buys on the other side of the channel.
More in Simpang Ampat
See all 2 in Simpang Ampat →Simpang Ampat, Penang
Floor plans, current price list, unit availability.
Ask about Aralia Park and it comes back the same day.