MyPropertyHubAsk us
Desa Park Chemor Phase 2 facade

Perak ·Ipoh

Desa Park Chemor Phase 2

Desa Park Chemor Phase 2 | Chemor, Ipoh | Freehold 2-Storey Cluster Terrace

Freehold4 bed1,454 – 1,887 sq ft— unitsCompletion Q4 2028
Floor plans, price list, availability

In short

Desa Park Chemor Phase 2 is a landed property in Ipoh, Perak by Falim Development. The development holds 4 bedroom layouts, built-ups from 1,454 to 1,887 sq ft. The land is freehold, completion is set for Q4 2028.

About Desa Park Chemor Phase 2

In Ipoh, Perak, Desa Park Chemor Phase 2 is the current release.

There are 8 layouts on offer covering 4 bedrooms between 1,454 and 1,887 sq ft. That range puts Desa Park Chemor Phase 2 within reach of more than one kind of buyer.

Desa Park Chemor Phase 2 is developed by Falim Development on freehold land. The land usage is classified as residential.

Set out plainly, it comes to a residential land title.

Desa Park Chemor Phase 2 is released in 8 layouts from 1,454 to 1,887 sq ft. The entry plan is Type A1 at 1,454 sq ft with 4 bedrooms. The largest is Type C3 at 1,887 sq ft running to 4 bedrooms. Sizes in the table are built-up; the lot dimensions are in the layout column. Every house is a two-storey cluster terrace with the same arrangement — three bedrooms and two bathrooms upstairs, and a guest room with its own bathroom, kitchen, living and dining downstairs — so the difference between types is the lot: A is intermediate, B is an end lot and C is a corner. Type C3 on the 72 ft by 60 ft corner adds a fourth bathroom and a terrace. All eight have a two-car porch and a rear yard.

TypeBuilt-upBedroomsBathrooms
A11,454 sq ft43
A21,469 sq ft43
B11,574 sq ft43
B31,593 sq ft43
B21,631 sq ft43
C11,634 sq ft43
C21,639 sq ft43
C31,887 sq ft44

Gallery

2 artist impressions
Desa Park Chemor Phase 2 streetscape

Why buyers take it

Freehold. No lease to run down and no state consent needed on a future sale — which also means no lease-extension cost landing on a later owner.

Completion set for Q4 2028. A published target gives the liquidated damages clause in the sale and purchase agreement something to bite on. Ask for the date in the agreement, which is the one that counts.

Held on a residential title. Assessment and utility tariffs follow the residential schedule rather than the commercial one. On a monthly bill that gap is real, and a lot of new stock cannot offer it.

Landed, so the land is yours. No share unit, no strata maintenance formula and no management corporation deciding what happens to the building. What you maintain is your own, and what you own includes the ground under it.

Layouts running to 4 bedrooms. Family-sized stock is a smaller pool than studios and twos, which cuts both ways: fewer competing units when you sell, and fewer comparables when a bank values it.

Why some walk away

No indicative price is published for this project. Without one you cannot compare it against anything else in Ipoh on a per-square-foot basis. Ask for the current price list by layout and floor band, not a single 'from' figure.

Landed stock is priced on the land, not the built-up. Two houses with the same floor area on different lot widths are not the same purchase. Get the lot dimensions in writing and compare those, not the square footage in the brochure.

It is not built yet. What you are buying is a drawing and a delivery date. Completion is set for Q4 2028, and dates set by developers move. Read the sale and purchase agreement on the liquidated damages clause, not the brochure.

Every figure on this page comes from the developer. Unit counts, built-ups, distances and completion dates are as published by the developer or its appointed agents, and none of it is independently verified. Check anything you intend to rely on against the sale and purchase agreement.

Project details

DeveloperFalim Development
LocationChemor, Ipoh, Perak
StatePerak
Property TypeLanded Property
TenureFreehold
Land TitleResidential
Land Area
Towers
Total Units
Total Floors
Units per Floor
Lifts per Floor
CompletionQ4 2028

Development at a Glance

Everything below comes from the developer’s own material. These are the figures that are fixed at construction — renovation changes none of them, so they are worth checking before anything else.

- **Developer** — Falim Development- **Property type** — Landed Property- **Tenure** — Freehold- **Land title** — Residential- **Car parking** — 2 cars- **Completion** — Q4 2028

What the numbers actually say

Car parking is 2 cars. In a completed development this is one of the few things you cannot renegotiate afterwards, so check it against how many cars you actually run.

Completion is stated as Q4 2028. Ask to see that date on the statutory panel rather than in the brochure headline, and hold the developer to the panel version.

### Unit Types

| Type | Size | Bedrooms | Bathrooms | Notes | |---|---|---|---|---| | A1 | 1,454 sq ft | 4 | 3 | intermediate lot, 20′ x 60′ | | A2 | 1,469 sq ft | 4 | 3 | intermediate lot, 20′ x 65′ | | B1 | 1,574 sq ft | 4 | 3 | end lot, 38′ x 60′ | | B3 | 1,593 sq ft | 4 | 3 | end lot, 32′ x 60′ | | B2 | 1,631 sq ft | 4 | 3 | end lot, 32′ x 60′ | | C1 | 1,634 sq ft | 4 | 3 | corner lot, 48′ x 60′ | | C2 | 1,639 sq ft | 4 | 3 | corner lot, 49’/51′ x 65′ | | C3 | 1,887 sq ft | 4 | 4 | corner lot, 72′ x 60′ |

Sizes in the table are built-up; the lot dimensions are in the layout column. Every house is a two-storey cluster terrace with the same arrangement — three bedrooms and two bathrooms upstairs, and a guest room with its own bathroom, kitchen, living and dining downstairs — so the difference between types is the lot: A is intermediate, B is an end lot and C is a corner. Type C3 on the 72 ft by 60 ft corner adds a fourth bathroom and a terrace. All eight have a two-car porch and a rear yard.

Location & Connectivity

Chemor sits about fifteen kilometres north of Ipoh, far enough out for land to still be affordable but close enough that the Jelapang toll onto the North-South Expressway is six kilometres away and Ipoh city centre a straightforward drive. The immediate neighbourhood already has Econsave, Sentral Mall, Pasar Chemor and Poi Lam School, with Bandar Baru Sri Klebang, Meru Raya and AEON Kinta City further down the same road.

- Tanah Hitam — 0.7 km- Econsave Chemor — 2.3 km- Sentral Mall — 2.3 km- Pasar Chemor — 3.2 km- Poi Lam School — 4.3 km- Jelapang Toll — North-South Expressway — 6.0 km- Mydin Mall — 9.8 km- Tenby School — 10.0 km- AEON Kinta City — 13.2 km- Bandar Baru Sri Klebang- Meru Raya- Ipoh city centre

Developer Background

Desa Park Chemor Phase 2 is developed by Falim Development.

The statutory particulars, from the developer’s own panel: Developer Licence 1149/09-2032/0363(R), 7 years, valid 14 September 2025 to 13 September 2032. Advertising & Sales Permit 1149-4/04-2028/0301(N)-(L), valid 22 April 2026 to 21 April 2028. Building plan BIL(24)DLM.MBI OSC(547-B)L/B/6/196/670/25, approved by Majlis Bandaraya Ipoh.

Frequently Asked Questions

**When will Desa Park Chemor Phase 2 be completed?** Q4 2028.

**What unit types are available at Desa Park Chemor Phase 2?** 8. Type A1 is 1,454 sq ft with 4 bedrooms and 3 bathrooms; Type A2 is 1,469 sq ft with 4 bedrooms and 3 bathrooms; Type B1 is 1,574 sq ft with 4 bedrooms and 3 bathrooms; Type B3 is 1,593 sq ft with 4 bedrooms and 3 bathrooms; Type B2 is 1,631 sq ft with 4 bedrooms and 3 bathrooms; Type C1 is 1,634 sq ft with 4 bedrooms and 3 bathrooms; Type C2 is 1,639 sq ft with 4 bedrooms and 3 bathrooms; Type C3 is 1,887 sq ft with 4 bedrooms and 4 bathrooms.

**How many car park bays come with a unit at Desa Park Chemor Phase 2?** 2 cars.

**Is Desa Park Chemor Phase 2 freehold?** Yes. The statutory advertisement panel lists the land tenure as Hak Milik Kekal — freehold.

**How many house types does Desa Park Chemor Phase 2 have?** Eight, all two-storey cluster terrace with four bedrooms: A1 (1,454 sq ft, 20′ x 60′ intermediate), A2 (1,469, 20′ x 65′ intermediate), B1 (1,574, 38′ x 60′ end), B3 (1,593, 32′ x 60′ end), B2 (1,631, 32′ x 60′ end), C1 (1,634, 48′ x 60′ corner), C2 (1,639, 49’/51′ x 65′ corner) and C3 (1,887, 72′ x 60′ corner). All have three bathrooms except C3, which has four.

**What is the layout of the house?** Upstairs there are three bedrooms and two bathrooms. Downstairs there is a guest room with its own bathroom, plus the kitchen, living and dining areas, a two-car porch and a rear yard.

**Is this the same as Desa Park Chemor Phase 1?** No. Phase 1 is a separate 116-unit phase that was scheduled for completion in December 2025. This page covers Phase 2 only, which is expected to complete in Q4 2028.

**What is inside the development?** A 1.47-acre recreation field with a children’s playground, laid out as open space within the phase.

**How much does a unit at Desa Park Chemor Phase 2 cost?** Want to know the price for Desa Park Chemor Phase 2? PM us now — our consultant will contact you immediately.

Facilities

Desa Park Chemor Phase 2 carries 5 facilities on the shared levels with 1.47-acre recreation field, Children's playground, Two-car porch and driveway to every house, Rear yard to every house, Reinforced concrete flat roof over the porch.

1.47-acre recreation field
Children's playground
Two-car porch and driveway to every house
Rear yard to every house
Reinforced concrete flat roof over the porch

Location

Desa Park Chemor Phase 2 is in Ipoh, Perak at Chemor, Ipoh, Perak. The immediate surroundings include Tanah Hitam, Econsave Chemor, Sentral Mall and Pasar Chemor.

What sits around Desa Park Chemor Phase 2 matters as much as what is inside it. Close by are Tanah Hitam (0.7 km), Econsave Chemor (2.3 km), Sentral Mall (2.3 km), Pasar Chemor (3.2 km), Poi Lam School (4.3 km) and Jelapang Toll (6.0 km). A further 6 are listed below.

Chemor sits about fifteen kilometres north of Ipoh, far enough out for land to still be affordable but close enough that the Jelapang toll onto the North-South Expressway is six kilometres away and Ipoh city centre a straightforward drive. The immediate neighbourhood already has Econsave, Sentral Mall, Pasar Chemor and Poi Lam School, with Bandar Baru Sri Klebang, Meru Raya and AEON Kinta City further down the same road.

  • Tanah Hitam — 0.7 km
  • Econsave Chemor — 2.3 km
  • Sentral Mall — 2.3 km
  • Pasar Chemor — 3.2 km
  • Poi Lam School — 4.3 km
  • Jelapang Toll — North-South Expressway — 6.0 km
  • Mydin Mall — 9.8 km
  • Tenby School — 10.0 km
  • AEON Kinta City — 13.2 km
  • Bandar Baru Sri Klebang
  • Meru Raya
  • Ipoh city centre

Developer: Falim Development

Desa Park Chemor Phase 2 is developed by Falim Development. See other projects by this developer →

Desa Park Chemor Phase 2, answered

Is Desa Park Chemor Phase 2 freehold or leasehold?

Desa Park Chemor Phase 2 in Ipoh, Perak is held on a freehold title on a residential land title.

What unit types are available at Desa Park Chemor Phase 2?

Desa Park Chemor Phase 2 offers 8 layouts from 1,454 to 1,887 sq ft — Type A1 at 1,454 sq ft, Type A2 at 1,469 sq ft, Type B1 at 1,574 sq ft, Type B3 at 1,593 sq ft.

When will Desa Park Chemor Phase 2 be completed?

Completion for Desa Park Chemor Phase 2 is scheduled for Q4 2028 Dates are set by the developer and can move.

Who is the developer of Desa Park Chemor Phase 2?

Desa Park Chemor Phase 2 is developed by Falim Development.

Where exactly is Desa Park Chemor Phase 2?

Desa Park Chemor Phase 2 is in Ipoh, Perak at Chemor, Ipoh, Perak Malaysia.

How do I get the floor plans for Desa Park Chemor Phase 2?

Message us on WhatsApp and a licensed representative sends the floor plans, the current developer price list and unit availability for Desa Park Chemor Phase 2. There is no fee to the buyer.

How many car park bays come with a unit at Desa Park Chemor Phase 2?

2 cars.

Is Desa Park Chemor Phase 2 freehold?

Yes. The statutory advertisement panel lists the land tenure as Hak Milik Kekal — freehold.

How many house types does Desa Park Chemor Phase 2 have?

Eight, all two-storey cluster terrace with four bedrooms: A1 (1,454 sq ft, 20' x 60' intermediate), A2 (1,469, 20' x 65' intermediate), B1 (1,574, 38' x 60' end), B3 (1,593, 32' x 60' end), B2 (1,631, 32' x 60' end), C1 (1,634, 48' x 60' corner), C2 (1,639, 49'/51' x 65' corner) and C3 (1,887, 72' x 60' corner). All have three bathrooms except C3, which has four.

What is the layout of the house?

Upstairs there are three bedrooms and two bathrooms. Downstairs there is a guest room with its own bathroom, plus the kitchen, living and dining areas, a two-car porch and a rear yard.

Is this the same as Desa Park Chemor Phase 1?

No. Phase 1 is a separate 116-unit phase that was scheduled for completion in December 2025. This page covers Phase 2 only, which is expected to complete in Q4 2028.

What is inside the development?

A 1.47-acre recreation field with a children's playground, laid out as open space within the phase.

Something here not answered?Ask about Desa Park Chemor Phase 2 on WhatsApp →

Guides worth reading before you decide

Ipoh, Perak

Floor plans, current price list, unit availability.

Ask about Desa Park Chemor Phase 2 and it comes back the same day.

Ask about Desa Park Chemor Phase 2