
Taman Kinding Akasia Phase 3A
Taman Kinding Akasia Phase 3A | Chemor, Ipoh | Single-Storey 3-Bedroom Terrace
In short
Taman Kinding Akasia Phase 3A is a landed property in Ipoh, Perak by Pesat Padu Villas. The development holds 70 units, 3 bedroom layouts. The land is leasehold, completion is set for November 2027.
About Taman Kinding Akasia Phase 3A
Taman Kinding Akasia Phase 3A sits in Ipoh, Perak, on a site of 33.25 acres. The layout comes to 12 blocks, a to l, 70 homes.
There is 1 layout on offer covering 3 bedrooms.
Taman Kinding Akasia Phase 3A is developed by Pesat Padu Villas on leasehold land. The land usage is classified as individual.
On paper the development reads as a site of 33.25 acres, an individual land title.
Unit types
Get the floor plans →Taman Kinding Akasia Phase 3A is released in 1 layout.
| Type | Built-up | Bedrooms | Bathrooms |
|---|---|---|---|
| Single Storey Terrace | 20' x 70' sq ft | 3 | 2 |
Floor plans
Ask for full resolution →Why buyers take it
Individual title, not strata. The title is issued on the lot itself, so there is no share unit, no management corporation and no strata maintenance formula. Transfers are simpler and the charge you pay is whatever the local council levies, not a building budget.
33.25 acres of site. Land that size leaves room between blocks rather than the tight footprint most infill sites are built on. Ask which way your stack faces and what is planned on the empty part of the site.
Landed, so the land is yours. No share unit, no strata maintenance formula and no management corporation deciding what happens to the building. What you maintain is your own, and what you own includes the ground under it.
Completion set for November 2027. A published target gives the liquidated damages clause in the sale and purchase agreement something to bite on. Ask for the date in the agreement, which is the one that counts.
Why some walk away
Leasehold. The lease runs down, extending it costs money, and a sale needs state consent, which takes time. Ask for the remaining term in writing — it matters more to a bank than to a brochure.
It is not built yet. What you are buying is a drawing and a delivery date. Completion is set for November 2027, and dates set by developers move. Read the sale and purchase agreement on the liquidated damages clause, not the brochure.
No indicative price is published for this project. Without one you cannot compare it against anything else in Ipoh on a per-square-foot basis. Ask for the current price list by layout and floor band, not a single 'from' figure.
No facility list is on record here. Ask for one in writing. What is shared decides a good part of the monthly charge, and a render of a pool is not a commitment to build one.
Landed stock is priced on the land, not the built-up. Two houses with the same floor area on different lot widths are not the same purchase. Get the lot dimensions in writing and compare those, not the square footage in the brochure.
Project details
| Developer | Pesat Padu Villas |
|---|---|
| Location | Chemor, Ipoh, Perak |
| State | Perak |
| Property Type | Landed Property |
| Tenure | Leasehold |
| Land Title | Individual |
| Land Area | 33.25 acres |
| Towers | 12 blocks, A to L |
| Total Units | 70 in Phase 3A, out of 154 across the development |
| Total Floors | — |
| Units per Floor | — |
| Lifts per Floor | — |
| Completion | November 2027 |
Development at a Glance
Everything below comes from the developer’s own material. These are the figures that are fixed at construction — renovation changes none of them, so they are worth checking before anything else.
- **Developer** — Pesat Padu Villas- **Property type** — Landed Property- **Tenure** — Leasehold- **Land title** — Individual- **Land area** — 33.25 acres- **Blocks** — 12 blocks, A to L- **Total units** — 70 in Phase 3A, out of 154 across the development- **Car parking** — Can park 2 cars- **Security** — Not gated and guarded- **Completion** — November 2027
What the numbers actually say
70 homes on 33.25 acres works out to roughly 2 lots per acre. On landed schemes that ratio is the single best proxy for how much land sits between you and your neighbour, and unlike a finish or a fitting it is settled the day the layout is approved.
Car parking is Can park 2 cars. In a completed development this is one of the few things you cannot renegotiate afterwards, so check it against how many cars you actually run.
There is one house type across the whole development, so the choice you are really making is the lot, not the layout. Walk the actual plot: an end or corner position buys side land that no floor plan shows.
Completion is stated as November 2027. Ask to see that date on the statutory panel rather than in the brochure headline, and hold the developer to the panel version.
### Unit Types
| Type | Size | Bedrooms | Bathrooms | Notes | |---|---|---|---|---| | Single Storey Terrace | 20′ x 70′ | 3 | 2 | intermediate unit, 22 ft porch depth |
Size in the table is the lot dimension — a 20 ft by 70 ft plot, drawn on the plan as a pair of intermediate units. Inside is a single-storey layout with three bedrooms and two bathrooms: the master bedroom at the front off the living area, bedroom two and bedroom three behind it along the party wall, the two bathrooms back to back in the middle of the plan, and the dining area and kitchen running down the other side to the rear. The porch takes two cars across a 22 ft depth. Blocks I, J, K and L are the ones the developer is releasing in this phase.
What Comes Fitted
The developer lists these as included, which is spend you would otherwise budget for on handover day.
- Reinforced concrete frame with clay brick or Acotec panel walls and cement roof tiles- Plaster glass ceiling sheeting with skim coat- Aluminium casement windows front, rear and side- Aluminium folding front door, layered timber bedroom doors, PVC bathroom doors and a metal rear door- Ceramic tiles to the living hall, dining area, kitchen and bathrooms; cement render to the porch- Bathroom wall tiles to 5 ft, kitchen tiles at the cooking area- Two water closets, two wash basins, two showers, six bib taps and a kitchen sink- Eleven to twelve lighting points, nine 13-amp sockets, a TV point, a fibre optic point and two fan points- Four-foot chainlink fencing with a mild steel gate
Location & Connectivity
Taman Kinding Akasia sits on 33.25 acres at Kinding, on the Chemor side of north Ipoh, along the corridor that runs from Jelapang out past Klebang and Tanjung Rambutan towards Kuala Kangsar. It is the affordable end of the Ipoh market rather than the city fringe: Chemor town and Bandar Baru Sri Klebang carry the daily shops and schools, Aeon Mall Ipoh Klebang is the nearest mall, and the Jelapang toll is the way onto the North-South Expressway.
- Chemor town- Aeon Mall Ipoh Klebang- Bandar Baru Sri Klebang- SMK Klebang Ria- Tanjung Rambutan- Jalan Kuala Kangsar- Jelapang toll, North-South Expressway- Ipoh city centre
Developer Background
Taman Kinding Akasia Phase 3A is developed by Pesat Padu Villas.
The statutory particulars, from the developer’s own panel: Developer Licence 20095/04-2028/0706(A), valid 09/04/2023 to 08/04/2028. Advertising & Sales Permit 20095-3/11-2027/0949(N)-(L), valid 11/11/2025 to 10/11/2027. Building plan reference MBI OSC(023-A) L/B/1/11/14/2025, approved by Majlis Bandaraya Ipoh. The advertisement is approved by Jabatan Perumahan Negara.
Frequently Asked Questions
**What is the land tenure at Taman Kinding Akasia Phase 3A?** The tenure is leasehold, on a Individual title.
**When will Taman Kinding Akasia Phase 3A be completed?** November 2027.
**What unit types are available at Taman Kinding Akasia Phase 3A?** 1. Type Single Storey Terrace is 20′ x 70′ with 3 bedrooms and 2 bathrooms.
**How many units does Taman Kinding Akasia Phase 3A have?** 70 in Phase 3A, out of 154 across the development on 33.25 acres.
**How many car park bays come with a unit at Taman Kinding Akasia Phase 3A?** Can park 2 cars.
**How big is the house at Taman Kinding Akasia Phase 3A?** A single-storey terrace on a 20 ft by 70 ft lot with three bedrooms and two bathrooms, and a porch deep enough for two cars.
**How many units are there?** The advertised phase carries 70 units. The whole development is 154 houses across twelve blocks, A to L, on 33.25 acres; blocks I, J, K and L are the ones released now.
**What is the layout inside?** The master bedroom sits at the front off the living area, bedroom two and bedroom three run behind it along the party wall, the two bathrooms sit back to back in the middle, and the dining area and kitchen run down the other side to the rear.
**Is Taman Kinding Akasia gated and guarded?** No. The developer’s project summary records it as not gated and guarded.
Location
The address places Taman Kinding Akasia Phase 3A in Ipoh, Perak at Chemor, Ipoh, Perak.
Developer: Pesat Padu Villas
Taman Kinding Akasia Phase 3A is developed by Pesat Padu Villas. See other projects by this developer →
Taman Kinding Akasia Phase 3A, answered
Is Taman Kinding Akasia Phase 3A freehold or leasehold?
Taman Kinding Akasia Phase 3A in Ipoh, Perak is held on a leasehold title on an individual land title.
What unit types are available at Taman Kinding Akasia Phase 3A?
Taman Kinding Akasia Phase 3A offers 1 layout.
How many units does Taman Kinding Akasia Phase 3A have?
Taman Kinding Akasia Phase 3A in Ipoh, Perak has 70 units.
When will Taman Kinding Akasia Phase 3A be completed?
Completion for Taman Kinding Akasia Phase 3A is scheduled for November 2027 Dates are set by the developer and can move.
Who is the developer of Taman Kinding Akasia Phase 3A?
Taman Kinding Akasia Phase 3A is developed by Pesat Padu Villas.
Where exactly is Taman Kinding Akasia Phase 3A?
Taman Kinding Akasia Phase 3A is in Ipoh, Perak at Chemor, Ipoh, Perak Malaysia.
How do I get the floor plans for Taman Kinding Akasia Phase 3A?
Message us on WhatsApp and a licensed representative sends the floor plans, the current developer price list and unit availability for Taman Kinding Akasia Phase 3A. There is no fee to the buyer.
What is the land tenure at Taman Kinding Akasia Phase 3A?
The tenure is leasehold, on a Individual title.
How many car park bays come with a unit at Taman Kinding Akasia Phase 3A?
Can park 2 cars.
How big is the house at Taman Kinding Akasia Phase 3A?
A single-storey terrace on a 20 ft by 70 ft lot with three bedrooms and two bathrooms, and a porch deep enough for two cars.
How many units are there?
The advertised phase carries 70 units. The whole development is 154 houses across twelve blocks, A to L, on 33.25 acres; blocks I, J, K and L are the ones released now.
What is the layout inside?
The master bedroom sits at the front off the living area, bedroom two and bedroom three run behind it along the party wall, the two bathrooms sit back to back in the middle, and the dining area and kitchen run down the other side to the rear.
Is Taman Kinding Akasia gated and guarded?
No. The developer's project summary records it as not gated and guarded.
Something here not answered?Ask about Taman Kinding Akasia Phase 3A on WhatsApp →
Guides worth reading before you decide
More in Ipoh
See all 37 in Ipoh →Ipoh, Perak
Floor plans, current price list, unit availability.
Ask about Taman Kinding Akasia Phase 3A and it comes back the same day.






